Loading Please Wait ....
Home Single Window System Structure of GMADA Downloads Contact us
 
 
 
1. Regional and Local Master Planning of area under the jurisdiction of GMADA:
With an objective to organise growth at macro & micro level Greater Mohali Area Development Authority is planning to prepare or review Regional Master Plan and six Master Plans under it’s jurisdiction .The consultancy for master planning , advising on policy matters and regulatory methodology,  the services of M/S Jurong Consultancy Pvt. Ltd., Singapore have been engaged. This exercise will facilitate GMADA for the systematic,  planned development of area which will encourage grouping of compatible usages and prevent  unauthorized, un-regulated growth and ribbon development.
 
2. Golf Course:
A Golf Course in Sector 91 and 93 along the Rivulets Patiala Ki Rao is on the anvil, covering approximately 293 acres of land in Mohali for which process to assemble land through land acquisition has already been initiated. This will add one more sport venture in the existing sports facilities in the Mohali district.
 
3. City Centre Sector 62, SAS Nagar:
Planning of City Centre Sector 62, SAS Nagar is being entrusted to M/S Jurong Consultancy Pvt. Ltd keeping the latest trends into picture. The  City Centre so envisaged intends to  be a State of the Art CBD in the World.
 

4.  Up gradation of existing road from Sector 48 to NH-21:

GMADA has approved the work of up gradation of existing road from Sector 48 to NH-21 for which estimates are being prepared. Tenders for part of this road have also been called and work will start shortly. To enable connectivity of this road with NH-21 some land is required to be acquired for which land acquisition proceedings have been initiated.

 
5. Providing Canal Water to the residents of Mohali:
To over come the shortage of water supply for the use of residents of Mohali, Canal Water is being looked at as an option, for which the work of 5th stage of water supply from Kajauli to Mohali has been initiated.
 
6. Sewerage Treatment Plant:
For the prevention of of environmental pollution  Sewrage Treatment Plant with ten MGD capacity has been planned in Mohali and for this work estimates are being prepared and land is in the process of being acquired.
 
7. Golf Range:

A Golf Range is under proactive consideration in Sector 48, Mohali where facilities such as Club, Restaurant, swimming pools  etc. is proposed to be  facilited.

 
8. Habitat Centre:

GMADA has constructed Habitat Centre in Sector 64, SAS Nagar which will be available for holding social, cultural, religious and other family functions to the residents. Guest house facilities shall also be available to the Business Sector for their visitors to Mohali. A larger Regional level  Habitat Centre is intended to be created in Sector 68, SAS Nagar where additional amenities are under active deliberations.

 
9. Knowledge City:

State Government has decided to develop Sector 81, SAS Nagar as Knowledge City. In this Sector following reputed institutions are proposed to be  set up:-

i)                 Indian Institute of Science Education and Research (IISER)
ii)                National Institute of Nanotechnology
iii)               National Institute of Agri Food Biotechnology
iv)               Premier Management Institute

Land in this sector would also be reserved for commercial use to facilitate easy access to these requirements and to encourage large scale exchange of intellectual thoughts amongst peers in vitalizing environment. It is also proposed to earmark  land for the Bio-Technology Park.

 
10. Expansion of Chandigarh Airport:

To upgrade  Chandigarh Airport to International level along with creating  cargo facilities towards Mohali side is under active consideration with a view  to bring far reaching economic benefit to this region. Modalities to enable this transport & communication infrastructure are being worked out. With the expansion of this Airport, it will project this local level facility to an International Airport with  direct international flights to the various countries .

 
11. Existing Land Use Mapping of area of GMADA:

GIS based existing Land Use Mapping for entire Region as a base document for the Master Planner was found essential to be prepared on GPRS enabled GIS format. The work was allotted to Centre for Computational Engineering, Punjab Engineering College, Chandigarh (CCE) The map is being prepared by digitization Satellite Images & SOI topo-sheets and Creation of GIS database for further analysis and decision support .

 
12. Meat & Fish market:
A hygienic &   State of the Art  Fish & Meat market is envisaged with enablement for Air-conditioning & refrigeration.  To facilitate freshness of left over meat/ fish refrigeration   is required for  which this additional space for storage and refrigeration units has been provided .Shops of compatible usage would also form part of the complex               
 
 
     
Greater Mohali has been planned to ahead of the times. It is India's only city where infrastructure development has preceded demand. And all facilities, beilt power , telecom , connectivity , are at par with best in the world
 
  GREATER MOHALI
AREA DEVELOPMENT AUTHORITY
Puda Bhavan, Sector62
SAS Nagar, Mohali
INDIA
Telephone: +91 0172-2215202-204
 
  GREATER MOHALI AREA DEVELOPMENT AUTHORITY, Copyright 2007, All rights reserved.